口腔综合治疗台安装的管路设计  被引量:1

Pre-installation pipeline design of comprehensive dental treatment unit

在线阅读下载全文

作  者:李鹏[1] 刘士龙[1] 王文彬[1] 李晓梅[1] 

机构地区:[1]青岛大学附属医院医学工程科,山东青岛266550

出  处:《医疗卫生装备》2014年第8期46-47,71,共3页Chinese Medical Equipment Journal

摘  要:目的:为了便于口腔综合治疗台安装完成后的维护,在安装前对其管路进行设计。方法:对口腔综合治疗台的安装位置、正压管路、集中供排水、负压吸引、电源线路5个方面进行设计。结果:按照该设计方法进行的管路安装,设备运行平稳、使用正常、后期维护方便。结论:良好的管路设计可使口腔综合治疗台安装顺利,使医生的诊疗工作得心应手,也方便今后的维护、检修和更新。Objective To design the pipeline before installation in order to facilitate the maintenance of the comprehensive dental treatment unit. Methods The design was performed from the aspects of position, positive-pressure pipeline, centralized water supply and drainage, negative-pressure suction and power source circuit. Results The design contributed to the operation and maintenance of the unit. Conclusion The pipeline design facilitates the installation, maintenance, repairing and renewal of the comprehensive dental treatment unit.

关 键 词:口腔综合治疗台 管路设计 正压管路 负压吸引 

分 类 号:R187[医药卫生—流行病学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象