检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2014年第8期25-26,共2页Water Resources & Hydropower of Northeast China
摘 要:第二松花江上游的松江河已经建成多座中小型水库,第二松花江的白山、红石、丰满等水库亦已建成运行多年,为了最大限度地发挥梯级水库的防洪作用,对松江河梯级及二松梯级水库联合调度的可行性进行了分析,得出松~白~丰梯级水库是否可以进行联合调度的结论。Many medium and small reservoirs have been built in Songjianghe river in upper reaches of the Second Songhua River. The reservoirs including Baishan, Hongshi and Fengman reservoir in the Second Songhua River have operated for many years. In order to play a role in flood control of cascade reservoirs to the utmost extent, the paper analyzes the feasibility of joint operation of cascade reservoirs in Songjianhe river and the Second Songhua Riverand gets the conclusion weather the joint operation of Songjianghe-Baishan-Fengman cascade reservoirs is feasible.
分 类 号:TV697.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.44.106