大直径立井三层凿井吊盘设计  被引量:4

Design on Three Floor Sinking Stage of Large Diameter Mine Shaft

在线阅读下载全文

作  者:李吉沧 

机构地区:[1]中煤第五建设有限公司第四十九工程处,河北邯郸056003

出  处:《建井技术》2014年第3期54-57,共4页Mine Construction Technology

摘  要:门克庆煤矿主井净直径9.6m,井深786.66m,选用Ⅵ型井架凿井。为适应井筒快速施工需要,设计制作了三层凿井吊盘,盘间距4m,通过8根立柱连接。吊盘主要由盘架、盘面、辅助盘、喇叭口、立柱、悬吊装置等组成,其结构满足了布置1台主提升机、2台副提升机的要求。该吊盘在整个井筒施工期间,安全可靠,确保了提升、吊挂系统的安全高效运行,达到了预期效果。A mine main shaft of Menkeqing Mine had a net diameter of 9.6m and a depth of 786.66 m.A Ⅵ type mine headframe was selected for the mine shaft sinking.In order to meet a rapid construction requirement of the mine shaft,a three floor sinking stage was designed and manufactured with a floor space of 4mand 8column connection.The sinking stage was mainly consisted of a stage frame,stage platform,auxiliary stage,feeding entry,column,suspended device and others.The stage structure could meet the requirements to arrange one main hoist and two auxiliary hoists.During the construction period of the mine shaft sinking,the stage was safety and reliable and could ensure a safety and high efficient operation of the hoisting and suspension system.An expected effect was obtained.

关 键 词:大直径立井 三层凿井吊盘 设计 悬吊设备 稳盘装置 

分 类 号:TD262.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象