检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西电力工业勘察设计研究院,南宁530023 [2]广西电力调度通信中心,南宁530023 [3]广西大学电气工程学院,南宁530004
出 处:《广西电力》2014年第4期11-14,共4页Guangxi Electric Power
摘 要:分析电动汽车参与V2G服务并网后对电网的影响。介绍了电动汽车充放电的特性,并分别从削峰填谷、负荷率、配电网电压3个方面阐述了电动汽车参与V2G服务并网后的有利前景。通过分析与验证,得到以下结论:电动汽车参与V2G服务并网后,对电网可起到削峰填谷的作用,同时可以增大负荷率,提高电力设备的利用率,对配电网可起到在低谷期降低线路电压、高峰期升高线路电压的作用,有利于电网的安全、稳定、经济运行。The influence of electric vehicle to power grid after its participation to V2G service connection is analyzed. Charging and discharging characteristics of electric vehicle are introduced. Favorable prospect of electric vehicle after its participation to V2G service connection is described from 3 aspects: peak load shifting, load rate and distribution network voltage. Based on analysis and verification, following conelusions are obtained: after the participation to V2G service connection, eleetrie vehicle can not only realize the peak load shifting function to power grid but also rise the load rate at the same and improve utilization rate of electric equipments, which can decrease the line voltage of distribution network in the low load period and increase the line voltage in the peak load period, and is benefit to the secure, stable and economic operation of power grid.
分 类 号:U463.6[机械工程—车辆工程] F426.471[交通运输工程—载运工具运用工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28