检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江科学院,湖北武汉430010
出 处:《福建建筑》2014年第8期79-80,76,共3页Fujian Architecture & Construction
摘 要:钻头打捞是桩基施工中常见工程事故处理方式,如方案比选不对、预判不周或遇偶然事件,极易发生安全事故,造成钻孔报废,给工程造成极大安全隐患。本文结合江口大桥6-4#桩基钻孔埋钻事故的处理过程及安全防护要点,介绍一种深孔大直径桩基钻头打捞方案,取得了预期结果,值得同类工程事故处理借鉴。Bit salvage is common in course of pile foundation construction engineering accident handling, such as loose scheme than choose wrong, anticipationor meet accident, safety accidents extremely easily, cause borehole scrap, has greatly safety engineering. Estuary bridge, this paper 6 - 4# drilling hole pilefoundation accident treatment process and key points of safety protection, this paper introduces a deep hole of large diameter pile foundation drilling salvageplan, achieve the expected results, is worthy of reference for the similar engineering accident treatment.
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145