丘陵区风电弃渣场水土保持措施设计探讨——以台山锅盖顶风电场项目为例  被引量:3

Study on Design of Soil and Water Conservation Measures in Wind Power Residue Field of Hilly Area——A Case Study of Guogaiding Wind Power Project in Taishan

在线阅读下载全文

作  者:丘保芳[1] 张凯锋[1] 程中秋[1] 

机构地区:[1]广东省水利电力勘测设计研究院,广东广州510635

出  处:《广东水利电力职业技术学院学报》2014年第3期9-11,共3页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering

摘  要:丘陵区风电场在工程建设中土石方量开挖量较大,产生大量弃渣,容易造成水土流失。对此从丘陵区风电工程弃渣的特点、渣场选址、防治措施的布置等方面进行探讨,以期在设计好弃渣场的前提下,减少水土流失对周边的影响。A large amount of earthwork is excavated in wind field of hilly area in the engineering construction and a lot of waste slag is produced. Therefore, it is likely to cause soil erosion. This paper discusses measures for the prevention and control of layout from the characteristics of such project and dreg site, in attempt to reduce the influence of soil erosion on the surrounding under the premise of finishing design of abandoned dreg site.

关 键 词:丘陵区 风电弃渣场 水土保持措施 

分 类 号:S157[农业科学—土壤学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象