齐热哈塔尔水电站调压室防渗设计研究  

Study on Impervious Design of Surge Chamber,Qirehatar Hydropower Project

在线阅读下载全文

作  者:周志博[1] 王立成[1] 刘靖[2] 

机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222 [2]天津市水利勘测设计院,天津300204

出  处:《西北水电》2014年第4期51-53,共3页Northwest Hydropower

摘  要:齐热哈塔尔水电站调压室所处边坡位置围岩较差,如发生衬砌渗水,将对边坡稳定产生威胁,并危及坡下电站的安全。通过论证,制定了综合渗水处理的方案:采取了掺入纤维混凝土、加强灌浆以及采用预应力混凝土衬砌等方式,以保证调压室边坡稳定及电站厂房的安全。The geological conditions of the surrounding rock of the slope where the surge chamber of Qirehatar Hydropower Project is exca-vated are weak.Once the lining leaks, the slope stability will be endangered.Furthermore, safety of the power plant at the foot of the slope will be threatened.Through demonstration, the following comprehensive scheme for seepage treatment is proposed:by application of the fibre concrete to be added, the strengthening grouting and the prestressed concrete lining, etc, the stability of the surge chamber slope and safety of the power plant are secured .

关 键 词:调压室 衬砌 渗水预应力 防渗设计 

分 类 号:TV732.5[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象