机构地区:[1]中水北方勘测设计研究有限责任公司,天津300222 [2]天津市水利勘测设计院,天津300204
出 处:《西北水电》2014年第4期51-53,共3页Northwest Hydropower
摘 要:齐热哈塔尔水电站调压室所处边坡位置围岩较差,如发生衬砌渗水,将对边坡稳定产生威胁,并危及坡下电站的安全。通过论证,制定了综合渗水处理的方案:采取了掺入纤维混凝土、加强灌浆以及采用预应力混凝土衬砌等方式,以保证调压室边坡稳定及电站厂房的安全。The geological conditions of the surrounding rock of the slope where the surge chamber of Qirehatar Hydropower Project is exca-vated are weak.Once the lining leaks, the slope stability will be endangered.Furthermore, safety of the power plant at the foot of the slope will be threatened.Through demonstration, the following comprehensive scheme for seepage treatment is proposed:by application of the fibre concrete to be added, the strengthening grouting and the prestressed concrete lining, etc, the stability of the surge chamber slope and safety of the power plant are secured .
分 类 号:TV732.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.140.134