检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:崔景山[1] 亓立刚[1] 隋杰明[1] 郭佳[1] 宁传红
机构地区:[1]中国建筑第八工程局有限公司天津分公司,天津300452
出 处:《施工技术》2014年第16期66-69,共4页Construction Technology
摘 要:结合目前国内外高支模施工技术的经验,针对我国某火箭基地89m高重型混凝土屋盖的设计要求与实际情况,自主设计出了一种使用塔架+贝雷架平台的组装式高支模施工方法,经过严格论证及精心施工,成功完成了国内首例89m高重型混凝土屋盖的施工任务。Based on the high-formwork construction experience both at home and abroad, the design requirements and actual situation of heavy concrete roof with 89 meters in height for some rocket base in China,the high-formwork construction method is independently designed by using tower and Bailey truss. The construction task of heavy concrete roof with 89 meters in height is completed successfully by strict demonstration and meticulous construction,which is the first practical example in our country.
分 类 号:TU755.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.83