检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁宗洪
出 处:《东北水利水电》2014年第9期49-52,共4页Water Resources & Hydropower of Northeast China
摘 要:黔中水利枢纽工程位于岩溶发育地区,混凝土面板堆石坝最大坝高157 m,水库总库容10.89亿m3,库首防渗帷幕灌浆总量235 000 m,工程量巨大,地质条件复杂。本文介绍了在该工程库首左岸泥岩、泥灰岩地层中进行帷幕灌浆施工试验的要求、布置、材料、工艺、特殊情况处理及试验成果,并提出了设计方案和施工参数优化建议。The Qianzhong hydro-junction project is locate on the district of Karst grown. The maximum dam height of the concrete face rockfill dam is 157 m and the total storage capacity of the reservoir is 10.89 ×108m3.The total curtain grouting quantity for the reservoir head seepage prevention is 235×103m3. Then the engineering quantity is large and the geological condition is complex. The paper introduces the requirements, layout, material,technique, especial trouble treatment and experiment result of the curtain grouting construction experiment in the mudstone and marl layer of the left bank of reservoir head region, puts forward the design scheme and optimization suggestion of construction parameter.
分 类 号:TV543.15[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.118