检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭恒[1] 付元强[1] 孙雁斌[1] 高东胜[1]
机构地区:[1]中国石化集团国际石油工程有限公司,北京100029
出 处:《中国安全生产科学技术》2014年第8期139-143,共5页Journal of Safety Science and Technology
摘 要:近年来,我国海外石油工程项目蓬勃发展的同时,面临公共安全极大挑战。现阶段我国石油企业的公共安全风险管理体系不尽完善,此方面的研究重点主要集中在应急救援等领域,为了及时应对复杂多变的公共安全风险,开展公共安全风险预警研究有着重要的现实意义。综合考虑现阶段海外石油工程项目面临的公共安全风险现状,从社会安定、自然灾害、公共卫生、事故灾难和综合管理五个方面系统分析其存在的公共安全风险,借助层次分析法和模糊综合评判,建立并计算公共安全风险预警指标体系的标准权重,确定预警评判集,最终提出一种海外石油工程公共安全风险预警方法,并给出应用步骤。将该风险预警方法运用到非洲某国,结果显示,与实际高度吻合,具有实际应用价值。In recent decades , more and more overseas petroleum projects are obtained and executed by our petrole-um giants, who confront kinds of security challenges in different countries and districts , because of so much insta-bilities in both politic situation and society .As a result of uncomplete management systems for security risks , and most researchers emphasize on others aspects such as emergency rescues , so that, in order to deal with the complex and multivariate security risk , assure the safeties of both people and assets , and protect the interests in abroad , the paper chooses the early warning of the overseas security risks as the research target , which has an enormous reality meaning.Firstly, according to these security risks confronted by all the overseas petroleum projects at present , the paper analyzes all the security risks systematicall in the aspect of society stability , natural disaster , public sanita-tion, accidents as well as comprehensive management , gets the roots of them after absorbing so many raw materials collected from kinds of petroleum managers riched in the experience and management of overseas projects , then builds up the early warning index hierarcy that has two layers .Then, with the help of AHP and comprehensive fuzzy evaluation , calculating and standardizing the weights of all the early warning indexes , the early warning meth-od targeted at the abroad security risksis obtained , when the fuzzy set for the early warning method is established . Finaly, the paper give out the application process and the new method is used in an African country .The analysis result is accorded with the present situation , so that the early warning method can effectively increases the accuracyfor the early warning of security in this country , and possesses much more applicable value in the abroad petroleum projects.
分 类 号:X937[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145