作 者:门永生[1] 于振[1] 朱朝阳[1] 吴睦远[2] 何真珍[2]
机构地区:[1]中国电力科学研究院,北京100192 [2]国家电网上海市电力公司,上海200122
出 处:《中国安全生产科学技术》2014年第8期169-174,共6页Journal of Safety Science and Technology
基 金:国家电网公司科技项目(JYYBGKJ[2013]133)
摘 要:当前我国电力系统安全性评估主要是针对电力系统本身建模和故障分析计算,而对电网基础设施的脆弱性评估目前还没有公认的定义和统一标准。针对电网基础设施,在研究不同领域脆弱性概念的基础上,给出了电网基础设施脆弱性的定义,并在分析比较电网领域及城市基础设施领域脆弱性评估方法的基础上,提出了基于PSR模型的电网基础设施脆弱性评估方法及思路,以某500kV变电站为例,进行脆弱性评估方法的实例验证,通过模型分析计算得出脆弱性指数,并依据标准判定其脆弱性等级为较轻。该方法的研究可为电网基础设施脆弱性评估提供重要的理论基础,可有效指导电网基础设施脆弱性评估工作的开展。Safety assessment of power system in China has been long focused on network modeling and failure anal -ysis.Vulnerability assessment for important power infrastructures is a new concept appeared in recent years .There are no unanimous definition and norm to carry out evaluation .In this paper , a precise concept on vulnerability of power infrastructures was defined firstly based on the analysis on vulnerability in various fields .Then, several methods of vulnerability assessment in the field of power grid and urban infrastructure were compared .At last, ac-cording to the concentration and requirement , the framework of vulnerability assessment for electric power infra-structures based on PSR (Pressure-Status-Response) model was proposed, and then, taking a 500kV transformer substation for example , the case verification of vulnerability assessments was conducted .The vulnerability index was calculated by the model , and its level of vulnerability was determined to be light based on criteria .The method provides theoretic guide for promotion and development of infrastructure vulnerability assessment in electric power system, and can guide the vulnerability assessment of power grid infrastructure effectively .
分 类 号:X921[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222