下告铁矿矿柱回收方案研究与实践  被引量:2

Research and Practice on the Pillar Recovery Scheme of Xiagao Iron Mine

在线阅读下载全文

作  者:孙江先 王星[2,3,4] 孙国权[2,3,4] 

机构地区:[1]紫金天鸥矿业有限公司 [2]中钢集团马鞍山矿山研究院有限公司 [3]金属矿山安全与健康国家重点实验室 [4]金属矿产资源高效循环利用国家工程研究中心

出  处:《现代矿业》2014年第8期7-10,共4页Modern Mining

基  金:十二五国家科技支撑计划(编号:2012BAB14B01)

摘  要:下告铁矿一直采用分段空场法进行回采,矿房回采不规范,使得矿石回收率较低,矿柱矿量和上、下盘残矿矿量较多。为了提高矿石回收率,满足矿山生产要求,分析了其地质概况和开采现状,确定采用3个区段3步骤回采方案进行矿柱的回收,取得了较好的应用效果。The open stope mining method is adopted in Xiagao iron mine, due to the mmmg memou of chambier is not standard, the ore recovery rate is very low and the residual amount of pillars and hang- ing wall and footwall are large. In order to enhance the ore recovery rate, meet the requirement of mine production, the geological situation and mining status of mining area are analyzed, besides that, the three sections and three steps stoping scheme is determined to recycling the pillars and good application effects are obtained.

关 键 词:矿柱回收 空区处理 回采方案 

分 类 号:TD853.391[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象