检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙江先 王星[2,3,4] 孙国权[2,3,4]
机构地区:[1]紫金天鸥矿业有限公司 [2]中钢集团马鞍山矿山研究院有限公司 [3]金属矿山安全与健康国家重点实验室 [4]金属矿产资源高效循环利用国家工程研究中心
出 处:《现代矿业》2014年第8期7-10,共4页Modern Mining
基 金:十二五国家科技支撑计划(编号:2012BAB14B01)
摘 要:下告铁矿一直采用分段空场法进行回采,矿房回采不规范,使得矿石回收率较低,矿柱矿量和上、下盘残矿矿量较多。为了提高矿石回收率,满足矿山生产要求,分析了其地质概况和开采现状,确定采用3个区段3步骤回采方案进行矿柱的回收,取得了较好的应用效果。The open stope mining method is adopted in Xiagao iron mine, due to the mmmg memou of chambier is not standard, the ore recovery rate is very low and the residual amount of pillars and hang- ing wall and footwall are large. In order to enhance the ore recovery rate, meet the requirement of mine production, the geological situation and mining status of mining area are analyzed, besides that, the three sections and three steps stoping scheme is determined to recycling the pillars and good application effects are obtained.
分 类 号:TD853.391[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13