Problems and countermeasures in construction of transmission line projects in permafrost regions  被引量:3

Problems and countermeasures in construction of transmission line projects in permafrost regions

在线阅读下载全文

作  者:GuoShang Wang QiHao Yu YanHui You Ze Zhang Lei Guo ShiJun Wang Yong Yu 

机构地区:[1]Gansu Electric Power Design Institute [2]State Key Laboratory of Frozen Soil Engineering,Cold and Arid Regions Environmental and Engineering Research Institute,Chinese Academy of Sciences [3]Gansu Power Transmission Transformation Company

出  处:《Research in Cold and Arid Regions》2014年第5期432-439,共8页寒旱区科学(英文版)

基  金:supported by the National Key Basic Research Program of China (973 Program) (No.2012CB026106);the Program for Innovative Research Group of the Natural Science Foundation of China (No.41121061);the fund of State Key Laboratory of Frozen Soil Engineer(No.SKLFSE-ZT-16)

摘  要:Construction of power transmission lines is becoming an important part of permafrost engineering in China.This paper reviews the construction status and problems of transmission lines in different countries,as well as corresponding solutions that would be of practical significance for sustainable engineering practices.Russia has the longest history of transmission line construction in permafrost areas,with transmission lines(mainly 220 kV and 500 kV) spanning approximately 100,000 km.However,all countries suffer from permafrost-related tower foundation stability problems caused by freezing-thawing hazards such as frost heave and thaw settlement,frost lifting,and harmful cryogenic phenomena.As point-line transmission line constructions,the lines,poles and towers should be reasonably selected and installed with a comprehensive consideration of frozen soil characteristics to effectively reduce the occurrence of freezing-thawing disasters.Reinforced concrete pile foundations are widely used in the permafrost regions,and construction in winter is also a universal practice.Moreover,facilitating engineering measures like thermosyphons are an effective way to reduce freezing-thawing hazards and to maintain the stability of tower foundations.Construction of power transmission lines is becoming an important part of permafrost engineering in China.This paper reviews the construction status and problems of transmission lines in different countries,as well as corresponding solutions that would be of practical significance for sustainable engineering practices.Russia has the longest history of transmission line construction in permafrost areas,with transmission lines(mainly 220 kV and 500 kV) spanning approximately 100,000 km.However,all countries suffer from permafrost-related tower foundation stability problems caused by freezing-thawing hazards such as frost heave and thaw settlement,frost lifting,and harmful cryogenic phenomena.As point-line transmission line constructions,the lines,poles and towers should be reasonably selected and installed with a comprehensive consideration of frozen soil characteristics to effectively reduce the occurrence of freezing-thawing disasters.Reinforced concrete pile foundations are widely used in the permafrost regions,and construction in winter is also a universal practice.Moreover,facilitating engineering measures like thermosyphons are an effective way to reduce freezing-thawing hazards and to maintain the stability of tower foundations.

关 键 词:PERMAFROST transmission line key issues ANALYSIS 

分 类 号:TM75[电气工程—电力系统及自动化] P642.14[天文地球—工程地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象