检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶新[1]
机构地区:[1]上海市政工程设计研究总院<集团>有限公司,上海200092
出 处:《中国给水排水》2014年第18期36-39,共4页China Water & Wastewater
摘 要:面对不容乐观的江河水源水质现状,净水厂处理工艺除常规处理外,还需考虑预处理及深度处理,或者在厂平面中预留场地,因此平面布置中处理构筑物单元众多,各单元间相互连接的各类管线繁复。在工艺流程顺畅、管理维护方便的条件下,对处理构筑物和辅助建筑物进行合理的组(叠)合布置,可以有效节省宝贵的土地资源,使得处理构筑物布置集中,功能分明且环境协调优美。为此,介绍了处理构筑物组(叠)合设计以及构筑物间连接设计方法,可供参考。Due to the deteriorating quality of raw water from rivers in China, pre-treatment and ad- vanced treatment or land reservation in water treatment plants using only conventional processes should be considered. Therefore, layout of treatment structures and connection of various pipes become much more complicated. Under the condition of suitable process flow and convenience of management and maintenance, the reasonable combination of structures could save the precious land resources, get structures together, clarify the functions and decorate the environment. Thus, the design of combination and connection of structures were introduced for reference.
关 键 词:预处理 常规处理 深度处理 工艺流程 构筑物组(叠)合布置
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222