某高耸进水塔地基处理方案优选  被引量:2

Scheme Optimization of Foundation Treatment for High-rise Intake Tower

在线阅读下载全文

作  者:杨文超[1] 张爱军[1] 徐龙飞[1] 张宇奇[1] 

机构地区:[1]西北农林科技大学水利与建筑工程学院,陕西杨凌712100

出  处:《水电能源科学》2014年第8期116-119,共4页Water Resources and Power

基  金:国家自然科学基金项目(51279171)

摘  要:针对新疆地区某水电站高耸进水塔地基不能满足上部结构要求的问题,采用PKPM软件中桩筏有限元计算模块和ADINA有限元软件,对高耸进水塔三种地基处理方案进行了计算分析。结果表明,桩基础、深齿墙+桩基础、无桩深齿墙三种方案均满足上部结构承载的要求;通过对比三种方案五个工况下的最大沉降量、应力及安全性等,并结合该高耸进水塔的项目特点,最终推荐选择无桩深齿墙方案。Aiming at the problem that high-rise intake tower foundation cannot meet the upper structure demands of a hydroelectric station in Xinjiang, analysis of the foundation treatment of a certain high-rise intake tower was conducted by using PKPM and ADINA finite element software. The calculation results indicate that all of three schemes (pile foundation, deep key wall combined with pile foundation, deep key wall without pile) can meet the design requirements of upper structure; comparison of maximum settlement, stress and safety under five different working conditions for three schemes was done. Finally, the scheme of deep key wall without pile was recommended considering the own characteristics of high-rise intake tower.

关 键 词:进水塔 高耸 地基处理 方案优选 桩基础 

分 类 号:TV223[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象