机构地区:[1]国电大渡河流域水电开发有限公司检修安装有限公司,四川乐山614900
出 处:《人民长江》2014年第17期52-53,88,共3页Yangtze River
摘 要:铜街子水电站2号机组原有过速保护系统已运行多年,存在影响机组安全运行的隐患。为杜绝飞逸事故的发生,提高过速保护动作的可靠性,在2012~2013年度检修中,对2号机组的纯机械保护系统进行了改造。在原有纯机械过速保护系统的基础上新增加了一套纯机械过速保护装置,同时改造了原有的液压控制回路。改造后2套纯机械过速保护装置关联运行,可有效提高机组的安全性。详细介绍了改造过程,可供同类工程参考。The original over -speed protection system of No. 2 unit of Tongjiezi Hydropower Station has been operated for years, so there are hidden dangers that may affect the safe operation of the units. In order to avoid runaway accident and improve the reliability of over-speed protection system, the purely mechanical over-speed protection system of No. 2 unit was reformed during the maintenance of 2012 to 2013. A set of purely mechanical over-speed protection device was added to the original sys-tem and the original hydraulic control circuit was reformed as well. The two purely mechanical over-speed devices were parallel-ly connected after reformation, which could improve the safety of the units. The reformation process was introduced in detail.
分 类 号:TV731[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15