出 处:《广西水利水电》2014年第4期57-58,70,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:在宝兴水电站引水隧洞底板施工过程中,通过现场浮碴混凝土底板抗外水抬动试验,并参考类似工程经验,对原素混凝土底板施工方案进行了优化,在部分Ⅱ-Ⅲ类围岩洞段采用浮碴混凝土底板,简化了底板清理的施工工序,降低了底板混凝土厚度,增加了混凝土底板及边墙排水孔,对控制投资、加快施工进度起到了积极作用。For the diversion tunnel of Baoxing Hydropower Project,field floating ballast concrete floor slab lifting test against external water pressure was conducted during construction. With reference to the testing results and the experience of similar projects,the original plain concrete floor slab construction scheme was optimized and floating ballast concrete floor slab scheme was adopted for the tunnel sections with II^III category surrounding rock ,which had played an active role in cost control and accelerating construction progress due to simplified floor slab cleaning procedures,reduced concrete slab thickness,increased drainage holes on base slab and walls.
关 键 词:引水隧洞 浮碴 底板外水压力 抬动试验 宝兴水电站
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117