检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]军械工程学院装备指挥与管理系,石家庄050003
出 处:《价值工程》2014年第28期282-283,共2页Value Engineering
基 金:国家"十二五"科技支撑计划课题(2011BAK09B02)
摘 要:为了使机械防凌破冰装备能够满足实际要求,提高装备的适应性,在装备概念设计前,对其任务进行了分析,确定了开凿流凌通道、破碎大块流凌、破除冰坝和消除冰塞这四大任务,并从环境、冰盖、主河床与流凌通道、水流、堤岸与滩地等方面对工况进行了设计,为进一步对防凌破冰装备及其承载平台的设计奠定了基础。In order to make mechanical icebreaking equipment may satisfy the actual requirement and raise the equipment's adaptability, the tasks should be analyzed before the conceptual design of equipment. In this paper, the following four tasks are ascertained:cutting the passageway for ice-flood, breaking big piece of ice-flood, getting rid of ice dam, eliminating ice jam. The operating condition of equipment is designed in environment, ice sheet, main riverbed, passageway, current, embankment and beach land, which lays the foundation for the further design of the icebreaking equipment and its platform.
分 类 号:TV875[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117