检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:栾光日[1,2] 王连俊[1] 李懿[3] 张光宗[1]
机构地区:[1]北京交通大学土木建筑工程学院,北京100044 [2]京沪高速铁路济南高速站工程建设指挥部,山东济南250001 [3]北京市市政工程设计研究总院有限公司,北京100082
出 处:《铁道学报》2014年第10期95-101,共7页Journal of the China Railway Society
基 金:铁道部科研项目(2008G032-A)
摘 要:对京沪高速铁路济南西客站PHC管桩和CFG桩联合堆载预压处理宽站场复合地基的沉降特性开展试验研究,监测不同宽度、不同桩型和桩长复合地基的地表沉降及分层沉降,分析沉降变形随路堤填筑高度和时间的变化规律,研究路基宽度对沉降量和沉降曲线形状的影响。研究结果表明:站场路基沉降-时间曲线包含沉降发展阶段(路基填筑阶段)、沉降快速发展阶段(堆载预压土至2~3个月静置期)和沉降基本稳定阶段;宽大站场PHC管桩及CFG桩复合地基在中心区附近呈现沉降洼地,而在中央区沉降洼地的两侧出现次一级沉降洼地;宽大站场PHC管桩及CFG桩复合地基附加应力较大,衰减速度慢,沉降影响深度大,30~50 m以下的地基沉降量约占总沉降的75%~85%,加固区范围内沉降量占总沉降的5%~10%。Experimental study was carried out on settlement characteristics of the preloaded PHC pipe pile and CFG pile composite foundation of the JinanWest Railway Station of the Beijing-Shanghai High-speed Railway . Surface settlement and layer settlement of the composite foundation with different widths and with piles of dif-ferent types and lengths were observed . The changing law of settlement deformations with embankment fill heights and time was analyzed . The influence of subgrade widthson the settlement magnitude and shape of set-tlement curve was investigated . The research results show as follows :The settlement-time curve of station subgrade includes the settlement development stage(the subgrade construction stage) , the rapid settlement de-velopment stage(the stage from soil preloading to 2~3 months standing ) and the basically stable settlement stage ;For the PHC pipe pile and CFG pile composite foundation of a large station ,a settlement depression ar-ea appears around the center of the station and secondary settlement depression areas appear on both sides of the center settlement depression area ;For the PHC piple pile and CFG pile composite foundation of a large sta-tion , the additional stress is large , its attenuating speed is low and settlement affects deeply ;settlement of foundation below 30~50 m takes up about 75% to 85% of the total settlement and settlement within the rein-forced areas takes up 5% to 10% of the total settlement .
关 键 词:宽大站场 PHC管桩和CFG桩 复合地基 堆载预压 沉降特性
分 类 号:U213.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.136.226