检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陆道渊[1] 刘灿[1] 姜文伟[1] 黄良[1] 李敏[1] 哈敏强
机构地区:[1]华东建筑设计研究院有限公司,上海200002 [2]上海三益建筑设计有限公司,上海200050
出 处:《建筑结构》2014年第18期14-17,共4页Building Structure
摘 要:介绍了天津现代城酒店塔楼及裙房多重复杂情况以及裙房体型收进、第一道加强层以上的竖向收进,并针对这两种类型的收进提出了增强抗震性能的措施。结果表明,裙房逐步收进可以有效减小结构竖向刚度突变;在第一道加强层上下的混凝土剪力墙内设置钢板可以减小刚度突变引起的损伤。另外详述了钢板-混凝土组合剪力墙的设计要点及构造。The multiple complicated conditions of the tower building and the podiums of Tianjin Modern Hotel were introduced as well as the vertical setback of the podiums and the vertical setback above the first strengthening story. Measures were proposed in corresponding to the two kinds of setbacks to improve the seismic performance. The results show that gradual setback of the podiums is'effective to reduce the vertical stiffness mutations. Setting steel plate in the concrete shear wall near the vertical setback above the first strengthening story is feasible to reduce the damage due to the stiffness mutations. The design approach and details of steel plate-concrete composite shear wall were introduced in detail.
关 键 词:多重复杂 超高层结构 体型收进 钢板-混凝土组合剪力墙
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.36