检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]昆明恒基建设工程施工图审查中心,昆明650011 [2]云南怡成建筑设计有限公司,昆明650118
出 处:《建筑结构》2014年第18期22-26,共5页Building Structure
摘 要:昆明人民路一号广场超高层塔楼高度为160.5m,采用全钢框架-钢中心支撑核心筒结构体系。介绍了工程结构选型及结构布置,整体计算分析及结果满足现行规范要求。根据性能目标进行整体结构的小震反应谱和弹性时程分析、关键构件的中震不屈服及整体结构的静力弹塑性分析,对薄弱部位采取加强措施,确保结构在满足建筑功能及合理经济的条件下具有较高的抗震性能。介绍用两种方法包络设计二道防线及将地下室钢框架转换为型钢混凝土框架的做法,可为类似结构设计提供参考。A super high-rise building in First Plaza on Renmin Road in Kunming adopts steel frame-concentrically braced core wall structural system with the height of 160. 5 meters. Selection of structural system and its layout were introduced. The overall calculation and analysis results could meet requirements of the current codes. Based on the targets of performance, the response spectrum and elastic time history analysis under the frequent earthquake of the overall structure were carried out, as well as non-yielding analysis of key members under the moderate earthquake and the Pushover analysis of the overall structure. Measures were taken to strengthen the weak parts to ensure the high seismic performance under meeting the requirements of architectural features and reasonable economic conditions. Two methods for envelope design of the second seismic fortification line were introduced as well as the transformation of steel frames into steel reinforced concrete frames in the basement, which could provide references for structural design of similar projects.
关 键 词:全钢框架-钢中心支撑核心筒 性能化设计 弹性时程分析 二道防线 静力弹塑性分析
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15