检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]深圳市深港产学研环保工程技术股份有限公司,广东深圳518055
出 处:《化工进展》2014年第A01期293-298,共6页Chemical Industry and Engineering Progress
摘 要:采用厌氧折流板反应器(ABR)处理赤糖废水,考察其在不同进水容积负荷下的启动情况。结果表明:在(35±1)℃条件下,经历60天成功地完成对ABR反应器的启动。进水COD容积负荷由1.0kgCOD/(m3·d)增加到6.0kgCOD/(m3·d),COD的去除率达到85%,pH值和氧化还原电位(ORP)也达到要求。通过采用不同进水容积负荷启动ABR,证明ABR成功启动的前提是进水COD容积负荷不宜过高,启动初期过高的COD负荷会使反应器内酸性物质大量积累,导致启动失败。Anaerobic baffled reactor (ABR) was used to treat blackstrap molasses wastewater and start up at different influent COD volumetric loadings was investigated.Start up at (35 ± 1)℃ was completed in 60 days.At influent COD volumetric loading from 1.0kg COD/(m3 · d) to 6.0kgCOD/(m3 · d),COD removal rate reached 85%,and pH value and redox potential (ORP) also met the requirements.Start up by using different influent COD volumetric loadings proved that influent COD volumetric loading should not be too high.Overly high COD loading caused acid accumulation in the reactor,leading to failure of start up.
分 类 号:X703.3[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.197.104