作 者:田野[1]
机构地区:[1]中铁大桥勘测设计院集团有限公司,湖北武汉430056
出 处:《铁路工程造价管理》2014年第5期22-25,30,共5页Railway Engineering Cost Management
摘 要:郑州黄河公铁两用大桥是新建石武客运专线上的一座新建桥梁,总长1 684 m,结构复杂,施工难度大。经论证,主桥第一联钢梁总体架设,采用在组拼平台上拼装成型,分次整体顶推施工方案。此文重点阐述其施工工艺流程,并针对施工工艺流程进行分部分项工程造价分析。通过分析与计算,主体结构钢梁总质量为25 706 t,工程造价为39 326.27万元,其经济指标为15 298元/t。Zhengzhou Huanghe River road - rail bridge is a new bridge on the Shi - Wu passenger dedicated line with the total length of 684 m, which has complicated structure and high construction difficulty. Through argument, the first main girder overall erection in the main bridge adopts the construction plan that firstly assembly molding in the the spellers platform, then pushing as a whole. This article emphasis on its con- struction technological process, and performs partial project cost analysis in terms of construction technol- ogy and procedure. Through the analysis and calculation, the total quality of the main structure steel beam is 25, 706 t, the project cost is 39, 3. 2627 million yuan, the economic index is 15 298 yuan/t.
分 类 号:U445.4[建筑科学—桥梁与隧道工程] F530.31[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15