检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长沙理工大学电气与信息工程学院,湖南长沙410114
出 处:《电力科学与工程》2014年第9期39-45,共7页Electric Power Science and Engineering
摘 要:提出了以有功网损和无功补偿设备投资最小的无功规划数学模型,以无功裕度法确定无功补偿点,采用逐年规划方式和利用改进遗传算法对模型进行求解。在最小负荷方式和最大负荷方式下无功规划的基础上建立了场景检验模型,以IEEE30节点系统为算例,将逐年优化方式与整体优化方式的规划结果进行对比,验证了所提模型和求解方法的有效性。Reactive power compensation nodes were confirmed according to reactive power margin and a reactivepower planning mathematical model was proposed with minimum yearly active power loss fee and minimum invest-ment in new addition of VAR equipment being both taken as objective function. The model was resolved by usingannually planning and improved genetic algorithm method. A kind of scenario based checking model was built un-der minimum and maximum load operation condition. Taking IEEE30 bus test system as an example, the resultcomparison between annually planning method and entire optimization method is carried out, which show the feasi-bility and validity of the proposed model.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43