检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕春法[1]
机构地区:[1]广东省水利水电技术中心,广东广州510635
出 处:《广东水利水电》2014年第8期37-38,43,共3页Guangdong Water Resources and Hydropower
摘 要:该文对省管河道管理范围内规划建设桥梁工程项目防洪评价工作中常见的开展时间滞后、忽视评价意见对方案论证比选的重要作用、设计方案有重大变更时的评价工作开展和评价工作不全面、深度不够等问题进行了归纳,分析提出了评价工作开展时间要求、评价意见在方案论证比选时的考虑以及评价工作基础资料收集、全面分析和补救措施的设计等解决对策,对同类工程项目开展防洪评价工作有一定的参考作用。In the paper , the normal problems in flood protection evaluations of crossing bridge engineerings in Guangdong main riv -ers have been sum up , such as delaying evaluations , ignoring the effect of evaluations on object selection , evaluations of object with large modification , lack of comprehensive evaluations etc ., and provides solutions as demand of evaluations work , consideration of evaluations on object selection , collecting basic datas , designing remedying measures etc ., and these researches can be consulted by the similar projects .
分 类 号:TV87[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15