那坡县污水厂一期配套管网工程设计方案对比  

Comparison of Design Schemes of Auxiliary Pipe Network Project in First Phase of Sewage Treatment Plant in Napo County

在线阅读下载全文

作  者:滕金文[1] 

机构地区:[1]广西建设职业技术学院,广西南宁530003

出  处:《中国给水排水》2014年第20期59-61,共3页China Water & Wastewater

摘  要:鉴于历史原因,许多城镇旧城排水系统大部分采用完全合流制,城镇道路普遍狭窄,无法实现完全分流制的改造,因此,城镇污水管网改造项目可考虑采用截流式合流制的排水体制,那坡县污水处理厂一期配套管网工程沿涝水河、城厢河河床两侧布置截流式合流制排水干管,从投资、拆迁、施工、管理等方面进行方案对比和优化设计,最终提出一个较优的方案。Due to historical reasons, the combined system has been adopted in most old sewage systems in many cities and towns. Because the urban roads are narrow, the reconstruction of separate system cannot be achieved. Therefore, the interception combined system could be adopted in reconstruction of urban sewage pipe network. The interception combined sewer system was planned to be arranged on the both sides of the riverbeds of Laoshui River and Chengxiang River in the auxiliary pipe network project in first" phase of Sewage Treatment Plant in Napo County. The scheme comparison and optimization design were conducted in terms of investment, removal, construction, management and so on. A better design scheme was proposed.

关 键 词:污水管网 河床埋管 渠管 橡胶鸭嘴阀 

分 类 号:TU992.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象