检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐亚[1] 朱雪梅[1] 刘玉强[1] 能昌信[1] 董路[1]
机构地区:[1]中国环境科学研究院固体废物污染控制技术研究所,北京100012
出 处:《中国环境科学》2014年第10期2692-2700,共9页China Environmental Science
基 金:国家环境保护公益性行业科研专项(201209022);2012年度院所基本科研业务专项(2012YSKY16)
摘 要:采用模糊理论描述风险评价过程的模糊不确定性,采用概率理论描述随机不确定性,同时为解决模糊数计算过程复杂的问题,将模糊变量表示成均匀随机变量的函数,用 Monte Carlo 算法模拟模糊变量之间的函数运算,从而实现模糊-随机方法的耦合.为验证该模糊-随机耦合模型的有用性,选取青海某汞化工污染场地进行案例研究,通过与 RBCA 模型比较,验证了该模型的基本精度,且能较好地表征场地参数的不确定性对风险评价结果的影响.案例分析的结果表明:人群主要暴露途径为经口摄入,贡献率为80%左右;正常暴露情形下,该场地的健康风险水平为0.28,风险水平可以接受,最不利情况下的健康风险风险水平为1.28,最不利情况出现的概率小于等于1%;该场地对人群的健康风险随着时间减小,在第6年左右其风险减小至可接受水平,建议无需对场地开展污染治理,只需在污染物高峰段(第1~6年或第6~8年)为居民提供替代水源以截断暴露途径,待场地污染水平自然衰减.Risk assessment is associated with uncertainties in nature, and neglect of those uncertain elements in evaluating risk will inevitably lead to difficulty for decision-makers in the stage of risk management and decision-making. Fuzzy theory was used to describe the fuzzy uncertainties, and probability theory was employed to describe the random uncertainties. A coupled fuzzy-stochastic model was built to resolve the problem of complex computation of fuzzy numbers in which fuzzy number are represented with the function of uniform random variables. Monte Carlo method was also used to simulate the computation between fuzzy numbers. One mercury contaminated site located in Qinghai Province was selected as a case to demonstrate the effectiveness and reasonability of this coupled model. The reasonability of this model was verified by comparing simulated results of the widely used RBCA model. The case study indicated that:1) the main exposure pathway was oral intake with a contribution rate of 80%;2) the health risk of this contaminated site was acceptable with non-carcinogenic Hazard Quotient (HQ) of 0.28 under normal exposure condition;under the most unfavorable exposure condition which appearance probability was less than 1%, the health risk was unacceptable with HQ equals to 1.28;3) the health risk would decline in time and reach to an acceptable level after about six years. Therefore, it was suggested that the related responsibility should provide other drinking water resources to eliminate the exposure routine in the period of the first 6 years or the 6-8 years rather than take engineering measurements to remediate this contaminated site.
分 类 号:X820.4[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80