检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网北京经济技术研究院,北京市102209 [2]中国电力科学研究院,北京市100192
出 处:《电力建设》2014年第10期64-68,共5页Electric Power Construction
摘 要:随着我国特高压工程建设的发展,越来越多的线路走廊需途径高山或丘陵地区,机械化施工程度高的岩石锚杆基础应用比例正逐步提高。根据特高压工程荷载大以及岩石地基覆盖层厚的特点,结合理论研究与现场试验成果,提出了特高压工程岩石锚杆基础适用型式、破坏模式及其承载力计算、施工和质量检测等方面的建议,为特高压工程中岩石锚杆基础的推广与应用提供参考。With the development of UHV transmission line construction in China, the share of hilly-mountainous region has more percent in transmission line terrain. So, rock anchor foundation with the advantage of high degree of mechanization construction has been widely applied in UHV transmission line. According to the characteristics of UHV engineering: the large load and the thickness overburden of rock foundation, this paper proposed some suggestions for the foundation styles, failure mode, bearing capacity calculation, construction and quality inspection methods of rock anchor foundation in UHV engineering, based on the theoretical study and field tests, which could provide references for the popularization and application of rock anchor foundation in UHV engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127