检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽皖北煤电集团钱营孜煤矿,安徽宿州234000
出 处:《江西煤炭科技》2014年第4期65-67,共3页Jiangxi Coal Science & Technology
摘 要:钱营孜煤矿西三采区胶带机大巷的掘进速度较慢,影响了正常接替生产,为提高岩巷掘进速度,实现矿井的高产高效,通过引进综掘机械化作业线,西三采区胶带机大巷创造了岩石巷道中月进尺245m的新纪录,为工作面的正常接替提供了保障。结合西三采区胶带机大巷EBZ-260综掘作业线施工情况,阐述了EBZ-260综掘作业线的施工工艺、劳动组织、技术保障、设备改进等,并针对施工中出现的问题提出了建议,对EBZ-260综掘作业线快速掘进及推广具有一定的借鉴意义。The slow excavation speed of conveyor belt tunnel at West third mining area,Qianyingzi Colliery affected the normal substituted production,in order to improve rock excavation speed and achieve high yield and efficiency of mine,the conveyor belt tunnel at West third mining area has created a new record of rock roadway footage of 245 meters in middle of the month by introducing operating line of full mechanized excavation mechanization,which provided guarantee for normal substitution of the face.Combined with the construction of EBZ-260 full mechanized excavation operating line of conveyor belt tunnel at West third mining area,the paper exposited the construction technique,labor organization,technical support,equipment improvement of EBZ-260 and proposed some suggestions aiming at the problems occurred in the construction,which had certain reference for the rapid excavation and popularization of EBZ-260.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28