检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《土木工程与管理学报》2014年第3期64-68,共5页Journal of Civil Engineering and Management
基 金:教育部人文社会科学研究项目(12YJA630050);天津市教委社会科学重大项目(2012JWZD32)
摘 要:选择适宜的工程项目交易方式是项目管理组织高效协同工作的首要任务,为工程项目目标的成功实现提供重要保障。选择工程项目交易方式的第一步是识别影响其选择的因素,然而考虑影响因素的不同组合得到的决策结果不同,决策者又难以全面考虑所有的影响因素并作出准确判断。因此需要从众多影响因素中识别出对项目目标实现相对重要的因素优先考虑。文章在文献回顾的基础上采用专家访谈的方式识别出19个工程项目交易方式选择的影响因素,并划分为四类,即项目特征、业主自我认知、控制权配置和市场环境,并采用问卷调查获得的数据计算其重要性指数,得出项目类型、思维惯性、业主能力、控制权配置及交易规则完善度较其他因素对选择工程项目交易方式的影响显著。Selectting the appropriate project delivery system is the primary task of efficient collaborative work of project management organization, providing an important guarantee for the successful implementation of the project objectives. The first step is to find the influencing factors to select the project delivery system. However, decision results obtained by different combinations of influencing factors are different. Decision makers are difficult to fully consider all influencing factors and make a reasonable judgment. Hence identify and priority the relatively more important influencing factors on the achievement of project objectives from a number of influencing factors. Through literature review and expert interviews and other ways to identify 19 influencing factors of selecting project delivery system, which are divided into four categories, that is project characteristics, self-awareness of owners, configuration of control and market environment. And use the data obtained from the questionnaire to calculate its importance index, obtained the project type, thinking inertia, the owners ability, configuration of control, sophistication of trading rules have significant impact on selection of project delivery system compared to other factors.
关 键 词:工程项目交易方式选择 影响因素 重要性排序
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222