检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩士强[1] 魏佳广[1] 李文博[1] 高堂钧 王吉祥[1]
出 处:《海洋工程》2014年第5期85-92,共8页The Ocean Engineering
摘 要:随着国内对海上油气进一步开发,迫切需要掌握深水导管架的安装技术。通过文昌19-1N油田导管架海上安装,介绍了该安装方法的特点、关键技术、主要施工过程及所需的设备设施;总结了导管架海上安装成功的经验教训;提出深水导管架、基盘对接安装的施工技术及环境限制条件,为今后类似工程提供借鉴。Nowadays, as the offshore oil and gas are explored rapidly in China, we need to grip the installation technology of deep water jackets urgently. In this article, the key technology, main operating process and the equipment needed for installation are described base on WC 19-1N project. The experience of success and the lesson of failure for jacket installation are sunnarized and the restrictions of subsea wellhead base structure installation in terms of techniques and environment are put forward, which provides referrences for future similar projects.
关 键 词:文昌19-1N油田 导管架 安装技术 扶正 插/打桩 基盘
分 类 号:P751[交通运输工程—港口、海岸及近海工程] TE42[天文地球—海洋科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28