沈阳地铁1号线车辆架修筹备  被引量:6

Preparations for Vehicle Intermediate Repair on Shenyang Metro Line 1

在线阅读下载全文

作  者:张萍[1] 王铁刚[1] 

机构地区:[1]沈阳地铁集团有限公司运营分公司,辽宁沈阳110000

出  处:《现代城市轨道交通》2014年第5期35-37,共3页Modern Urban Transit

摘  要:通过对沈阳地铁1号线车辆现状及架修水平的分析,制定适合沈阳地铁1号线的架修维修策略,阐述沈阳地铁公司如何根据架修策略从设备、人员架构、工艺规程、人员培训、物料、委外、架修能力、架修计划等方面对地铁车辆进行架修筹备。The paper makes an analysis on the present situation of the vehicles and intermediate repair level on Shenyang metro line 1, the development of vehicles intermediate repair strategy suitable for Shenyang metro line 1. On the vehicles intermediate repair policy, Shenyang metro Corporation makes preparations for metro vehicle intermediate repair in the aspects of the plant and equipment, personnel structure, technological procedure, training of personnel, materials and supply, outsourcing, intermediate repair capacity and intermediate repair plans etc.

关 键 词:地铁车辆 架修 筹备 策略 

分 类 号:U279[机械工程—车辆工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象