检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]福建福清核电有限公司,福建福清350318 [2]中国核电工程有限公司,北京100048
出 处:《中国核电》2014年第3期250-255,共6页China Nuclear Power
摘 要:M310型机组蒸汽发生器二次侧水压试验,是对蒸汽发生器二次侧管板的严密性及相关系统耐压性的验证。由于蒸汽发生器的重要性,其水压试验用水对温度及水质有着严格的要求。通过对福清核电1号机组二回路水压试验水温控制和水质调节的探讨,有助于对M310型机组蒸汽发生器水压试验准备工作起到良好的指导意义。The secondary side hydrostatic test for the steam generator of M310 unit is to verify the pressure tightness of steam generator secondary side tube sheet and related systems. As for the importance of the steam generator, the water temperature and water quality of hydrostatic test has strict requirements. The discussion on the water temperature control and water quality regulation for the secondary loop hydrostatic test of Fuqing Unit 1 contribute greatly to the guiding work for the preparation of the steam generator pressure test for M310 unit.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.161.16