作 者:刘玉青[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2014年第10期1-3,71,共3页Water Resources & Hydropower of Northeast China
摘 要:桦甸大堤作为丰满水电站大坝的副坝工程,其防洪安全受到丰满水库水位及回水水位的影响。文章结合丰满水电站大坝全面治理工程设计对大堤原设计水位进行复核,以及对该工程百年一遇洪水回水进行计算,发现大堤原设计水位未达到百年一遇防洪标准,导致该工程洪水回水超过大堤设计水位,并对大堤的防洪安全提出了建议。The Huadian levee is used as the auxiliary dam project of Fengman hydropower station dam, its flood control safety is affected by the levels and backwater water level of Fengman reservoir. Combined with the comprehensive treatment project about dam of Fengman hydropower station, the paper rechecks the original design level of levee and calculates the backwater of flood encountered once in 100 years for the project, the re sult shows that the original design level of levee fail to reach the flood control standards encountered once in 100 years, then the flood backwater exceed the design water level of the levee. Some suggestions are provided to ensure the flood control safety of levee.
分 类 号:TV62[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38