利用足尺模型试验进行沉管全断面浇筑混凝土施工性能研究  被引量:1

Study on Construction Performance of Immersed Tube Full Section Concrete Grouting in Full-scale Model Test

在线阅读下载全文

作  者:王迎飞[1] 李超[1] 张宝兰[1] 刘行[1] 许晓华[1] 

机构地区:[1]中交四航工程研究院有限公司,广东广州510230

出  处:《施工技术》2014年第18期6-9,15,共5页Construction Technology

基  金:国家科技支撑计划项目资助(2011BAG07B04)

摘  要:通过2段长度均为5.8m的足尺模型,研究了皮带机输送与泵送输送工艺对混凝土坍落度与坍落扩展度、凝结时间与重塑时间、温度、硬化混凝土外观等施工性能的影响。结合工艺、场地、施工控制、后续施工影响等方面对比,确定港珠澳大桥沉管预制施工,将采用搅拌运输车结合地泵输送混凝土进行沉管混凝土全断面浇筑施工。Influence of transporting process belt conveyor and pump on concrete slump and slump flow, the setting time and the remodeling time, temperature, hardening concrete appearance construction performance had been studied using two sections full-scale model in a vertical length of 5.8m. Combined with the process, construction site, construction control, the following construction, concrete would be carried by mixing carrier vehicle and pump for construction of immersed tube precast Hongkong-Zhuhai-Macao Bridge.

关 键 词:混凝土 足尺模型 沉管 泵送 

分 类 号:TU528[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象