贯通钢筋PBL剪力键静动载性能试验研究  被引量:5

Test Study of Static and Dynamic Load Performance of PBL Shear Connector Structure with Through Reinforcement

在线阅读下载全文

作  者:江祥林[1,2] 陈一馨[3] 吕彭民[3] 

机构地区:[1]长安大学公路学院,陕西西安710064 [2]江西省交通科学研究院,江西南昌330038 [3]长安大学道路技术与装备教育部重点实验室,陕西西安710064

出  处:《桥梁建设》2014年第5期51-55,共5页Bridge Construction

基  金:江西省交通运输厅重点科技项目(2010C00003)~~

摘  要:为研究钢-混凝土结合段部位PBL剪力键结构的极限抗剪承载力与疲劳性能,依据某大桥钢-混凝土结合段剪力键实际结构,设计并制作了14个PBL剪力键结构推出试件进行静载与疲劳推出试验,分析了其荷载~滑移曲线、疲劳性能及疲劳破坏方式,并拟合得到荷载~滑移曲线计算公式及失效概率为50%与2.3%时的荷载与寿命曲线方程。结果表明:在静载推出试验中,PBL剪力键结构试件混凝土纵向劈裂破坏,其极限承载力均值为198.11kN;在疲劳试验中,试件混凝土榫破碎,同时贯通钢筋被剪断。To study the ultimate shear capacity and fatigue performance of the Pt3L shear connector structure used in the part of the steel and concrete joint section, 14 PBL shear connector structure specimens were designed and prepared according to the actual connector structure of the steel and concrete joint section of a bridge and the static 10ad and fatigue push-out tests for the specimens were carried out. The loadslip curves, the fatigue performance and fatigue failure ways of the specimens were analyzed. The load~slip curve formula and the load and life curve e- quation with the failure probability respectively being 50% and 2.3% were fitted and obtained. The results of the study demonstrate that in the static load push-out test, the concrete of the PBL shear connector structure specimens splits in the longitudinal direction and fails and the average value of the ultimate shear capacity of the specimens is 198.11 kN while in the fatigue test, the concrete dowels of the specimens crush and the reinforcement is broken by shear.

关 键 词:组合梁结构 钢-混凝土结合段 PBL剪力键 推出试验 极限承载力 疲劳试验 疲劳性能 

分 类 号:TU398[建筑科学—结构工程] U441.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象