检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中南大学资源与安全工程学院,长沙410083
出 处:《安全与环境学报》2014年第5期45-49,共5页Journal of Safety and Environment
摘 要:矿柱是地下矿山支撑顶板围岩、维持采场稳定的关键结构要素。为迅速准确地判别矿柱稳定性,采用数量化理论II(QTII)建立了地下矿山矿柱稳定性判别模型。选取矿柱宽度、矿柱高度、矿柱宽高比、矿岩单轴抗压强度和矿柱承受载荷作为评价指标,以40组样本数据进行训练,得到了相应的判别系数矩阵,确定了各类样本在5维空间中的中心点和各样本点。利用该模型对训练样本进行回判,判别结果完全正确。用10组样本数据对该判别模型进行检验,结果表明,该模型能较好地判别预测矿柱的稳定性,可以作为一种矿柱稳定性判别工具在工程实践中应用。This paper is aimed at introducing our research on the pillars stability assessment in the underground coal mine based on the quantification theory II. As is known, it is the pillar that is the key structural elements sustaining the weight of roof rock masses and keeping the stability of the stope in the underground mining. In order to predict the stability of the pillars as efficiently and precisely as possible, we have established an assessment model by taking the advantage of the quantification theory II (QTII), which is a multivariate statistics analysis method for exploring the unknown properties of the samples based on the known samples. The basic working principle of the method lies in that the failure mechanism of pillars can be clarified with three typical failure models. To do the assessment, we have chosen five indexes for the assessment as the evaluation indictors, which include the width, the height, the ratio of the pillar width to its height, and the uniaxial compressive strength of the rock and the pillar stress. In doing our assessment, first of all, we have to decide the initial matrix of pillar samples. And, secondly, the assessment matrix can be obtained through the mathematical manipulation upon the ini- tial matrix. And, thirdly, the central points of different kinds of pillars (both the stable pillars and the instable pillars)and points in correspondence with the unknown samples in 5-dimensional space can be worked out by multiplying the different matrixes. And, fourthly, the assessment can be done by calculating and comparing the distances between the points corresponding to the unknown samples and the central points of the different kinds of the pillars. If the distance from the point to the central point of the stable pillars is smaller, it would mean that the corresponding samples are stable. If the distance between the point appointed and the central point of the instable pillars is smaller, it would mean that the corresponding samples are instable. Thus, the 40 sets of
关 键 词:安全工程 地下矿山 矿柱 稳定性 数量化理论II 判别
分 类 号:X936[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69