综合物探检测技术在乌东德水电站建设中的应用  被引量:9

Application of comprehensive geophysical detection in construction of Wudongde Hydropower Station

在线阅读下载全文

作  者:张建清 陈敏 蔡加兴 丁亮清 谭显江 

机构地区:[1]长江工程地球物理勘测武汉有限公司,湖北武汉430014

出  处:《人民长江》2014年第20期59-63,共5页Yangtze River

摘  要:对物探检测技术在乌东德水电站建设中的应用进行了介绍。在前期勘察中,利用物探方法了解坝址区的主要工程地质问题;在施工期,物探方法成为施工质量检测的主要手段,对主厂房、导流洞等地下洞室围岩及衬砌质量等施工质量进行检测和评价。物探检测技术的应用较好地解决了工程质量控制问题,提高了工程质量验收的可靠性和科学性,从而更好地保证了工程整体质量。The application of comprehensive geophysical detection method in construction of Wudongde Hydropower Station is introduced. In the pre - stage exploration, the main engineering and geological problems in the dam site was studied by geophysi- cal detection method; in the construction period, the geophysical detection method became the major means to detect the con- struction quality, and the quality of surrounding rock of main power house, diversion tunnel and lining was tested and evaluated, which solved the problem of quality control, improved the reliability and scientificalness of engineering quality check and accept- ance, so the equality of the project could be ensured.

关 键 词:物探检测 工程地质问题 施工质量 乌东德水电站 

分 类 号:TV698.14[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象