220 kV湾塘变数字化改造出现问题及解决措施  

The problem and solution about digitized transformation of the 220 kV Wantang Transformer Substation

在线阅读下载全文

作  者:辛丽娜[1] 胡星[1] 

机构地区:[1]贵阳供电局,贵州贵阳550002

出  处:《贵州电力技术》2014年第10期77-80,共4页Guizhou Electric Power Technology

摘  要:变电站自动化系统经过十几年的发展已经达到一定水平,使数字化变电站改造及建设逐步铺开成为可能。结合贵州电网首个220 kV数字化变电站改造中出现的问题进行分析并提出解决措施,提高数字化变电站运行维护水平,为其他变电站数字化改造及建设提供经验。The automation level of power substation had made a great achievement after decades of years of development. So it made possible to carry out digitized transformation or construction of substation step by step. Based on the problem of the first 220 kV Wantang Transformer substation in Guizhou Power Grid, this paper analyzed and putted forward the solution, which could improve the level of operating maintenance and provide useful experience for digital construction and maintenance of Transformer substation.

关 键 词:数字化变电站 改造 智能化 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象