广州蓄能水电厂计算机监控系统升级改造策略  被引量:1

Innovation Tactics of Computer Supervision Control System of Guangzhou Pumped Storage Power Station

在线阅读下载全文

作  者:方峻 

机构地区:[1]广州蓄能水电厂,广东广州510950

出  处:《水力发电》2014年第11期11-13,18,共4页Water Power

摘  要:通过对广州蓄能水电厂A、B厂计算机监控系统上位机的改造和研究,分别从系统功能、备品备件、上下位机通讯技术、电网效益、投资等多角度对蓄能电厂计算机监控系统改造策略的核心思想及关键技术进行了论述,实践中提出的观点可供国内各种类型水利发电厂的计算机监控系统的改造借鉴参考。In view of the innovation and study of host computers in the Plant A and B of Guangzhou Pumped Storage Power Station, the core ideas and key technologies of upgrade strategies of the Computer Supervision Control System (CSCS) in pumped storage power station are illustrated from the aspects of system funetions, spare parts, communication techniques between upper computers and lower machines, power grid benefits and investments. The views proposed herein have a reference to the upgrade of CSCS in other domestic hydroelectric power stations.

关 键 词:监控系统 改造 策略 关键技术 广州抽水蓄能电厂 

分 类 号:TP277[自动化与计算机技术—检测技术与自动化装置] TV743[自动化与计算机技术—控制科学与工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象