检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水力发电》2014年第11期39-41,45,共4页Water Power
基 金:南方电网科技项目(K-ST2013-002)
摘 要:广州蓄能水电厂A、B厂的蓄能机组运行时间均超过了12年。随着机组的升级改造,遇到了很多特殊但是具有代表性的问题。结合广州蓄能水电厂运行实际,针对机组主变的保护配置、跳闸回路设计、CT选型、可编程动作逻辑等问题进行了总结与深入分析,并对抽水蓄能机组国产保护的优化提出了几点建议。The units in Plant A and B of Guangzhou Pumped Storage Power Station have operated more than 12 years. With the upgrading of the units, many special and representative problems are encountered. Based on the actual operation of Guangzhou Pumped Storage Power Station, the problems of generator-motor and main transformer protection configurations, tripping circuit design, CT selection and programmable action logic are summarized and analyzed in depth. Several suggestions on the optimization of pumped storage unit operation are also presented.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15