检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖北工业大学管理学院,湖北武汉430068 [2]汉大学经济与管理学院,湖北武汉430072
出 处:《数学的实践与认识》2014年第18期53-58,共6页Mathematics in Practice and Theory
基 金:教育部人文社会科学研究青年基金(14YJC630201)
摘 要:提出了一种基于DEA/AHP两阶段的工程项目评标方法,首先运用模糊综合评判法来确定定性指标的得分并将其作为定性指标值;其次运用DEA方法计算每一对投标方案相对效率的比值并以此为基础构造判断矩阵;最后运用单一层次的AHP方法对各投标方案进行全排序.通过实例分析表明,方法科学实用,能够为一般的工程项目评标活动提供有效的参考.This paper puts forward a tender evaluation method for engineering projects based on two-stage model of DEA/AHP. Firstly, we used the fuzzy comprehensive evaluation method to determine the score of qualitative indicators as qualitative indicators values; secondly, we used the DEA model to calculate the ratio of relative efficiency of every two tenders and on basis of which we constructed a judgment matrix; finally, we used the single layer AHP to sort various tenders fully. The case shows that the method is scientific and practical, providing an effective reference in tender evaluation activity for a general engineering project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117