基于DEA/AHP两阶段的工程项目评标方法研究  被引量:8

Research on Tender Evaluation Method for Engineering Proiects Based on Two-Stage Model of DEA/AHP

在线阅读下载全文

作  者:张熠[1] 王先甲 

机构地区:[1]湖北工业大学管理学院,湖北武汉430068 [2]汉大学经济与管理学院,湖北武汉430072

出  处:《数学的实践与认识》2014年第18期53-58,共6页Mathematics in Practice and Theory

基  金:教育部人文社会科学研究青年基金(14YJC630201)

摘  要:提出了一种基于DEA/AHP两阶段的工程项目评标方法,首先运用模糊综合评判法来确定定性指标的得分并将其作为定性指标值;其次运用DEA方法计算每一对投标方案相对效率的比值并以此为基础构造判断矩阵;最后运用单一层次的AHP方法对各投标方案进行全排序.通过实例分析表明,方法科学实用,能够为一般的工程项目评标活动提供有效的参考.This paper puts forward a tender evaluation method for engineering projects based on two-stage model of DEA/AHP. Firstly, we used the fuzzy comprehensive evaluation method to determine the score of qualitative indicators as qualitative indicators values; secondly, we used the DEA model to calculate the ratio of relative efficiency of every two tenders and on basis of which we constructed a judgment matrix; finally, we used the single layer AHP to sort various tenders fully. The case shows that the method is scientific and practical, providing an effective reference in tender evaluation activity for a general engineering project.

关 键 词:数据包络分析 层次分析法 模糊综合评判法 工程项目 评标 

分 类 号:F224[经济管理—国民经济] F282

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象