检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《施工技术》2014年第19期9-12,16,共5页Construction Technology
摘 要:以某高层建筑逆作法项目为研究背景,采用ABAQUS有限元软件对逆作过程进行施工过程的数值模拟分析。对支护结构与主体地下结构相结合的深基坑建立了考虑土、支护结构、水平支撑体系和竖向支承系统共同作用的二维平面有限元模型,采用弹塑性的修正剑桥本构模型模拟基坑开挖过程中土体的非线性特性,分析了地下连续墙水平位移与墙身弯矩随施工过程的变化以及地下连续墙与立柱桩的沉降及其差异沉降。Based on the top-down project of a high-rise building, this paper carried out the analysis of numerical simulation of the top-down process of the construction process by applying the finite element software of ABAQUS. A two-dimensional finite element model considering the interactions between the soil and structures is set up to simulate the construction procedures of a deep foundation excavation supported by permanent structure. The elastic-plastic modified Cam-clay constitutive model is used to present the behavior of the soil. At the same time, this thesis also analyzes the horizontal displacement and moment of the diaphragm wall with the change of construction process as well as the settlement and differential settlement between erect column and diaphragm wall.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222