Estimating harvest costs and projecting quantities of logging residues for small-scale forestry in Nasushiobara, Tochigi Prefecture, Japan  

Estimating harvest costs and projecting quantities of logging residues for small-scale forestry in Nasushiobara, Tochigi Prefecture, Japan

在线阅读下载全文

作  者:Chikara Nakahata Ryo Uemura Masashi Saito Kanae Kanetsuki Kazuhiro Aruga 

机构地区:[1]Department of Forest Science, Faculty of Agriculture, Utsunomiya University, 350 Mine, Utsunomiya 321-8505, Japan [2]Frontier Agriscience and Technology Center, Faculty of Agriculture, Shinshu University, Nagano 399-4598, Japan [3]Nasunogahara Land Improvement Districts, Tochigi 329-2807, Japan

出  处:《Journal of Forestry Research》2014年第4期965-974,共10页林业研究(英文版)

摘  要:We used GIS on a regional scale to estimate and compare supply potentials and costs of small-scale logging systems, a mini-forwarder and a 4-ton truck operated by private logging contractors, and manual logging and a light truck operated by individual forest own- ers, with the mechanized operational system of the Forest Owners' Asso- ciation. Total potential yields of timber and logging residues were esti- mated as 418,895 m3 and 254,962 m3, respectively. The economic bal- ances were estimated and available amounts were projected as supply potentials from profitable sub-compartments. As a result, available amounts of timber and logging residues were estimated at 375,466 m3 (89.9%) and 203,850 m3 (80.0%), respectively. Because their transport expenses were lower than for other systems the most profitable sub-compartments were operated by private logging contractors who sold logging residues at a plant. The profitable sub-compartments operated by individual forest owners were few because the extracting distances were usually greater than 20 m. Raising logging residue prices from 3,000 yen·m-3 to 4,080 yen·m-3 or 6,800 yen·m-3, and establishing forest roads, which reduced some extracting distances to less than 20 m, increased the number and area of profitable sub*compartments, and increased available amounts of logging residues.We used GIS on a regional scale to estimate and compare supply potentials and costs of small-scale logging systems, a mini-forwarder and a 4-ton truck operated by private logging contractors, and manual logging and a light truck operated by individual forest own- ers, with the mechanized operational system of the Forest Owners' Asso- ciation. Total potential yields of timber and logging residues were esti- mated as 418,895 m3 and 254,962 m3, respectively. The economic bal- ances were estimated and available amounts were projected as supply potentials from profitable sub-compartments. As a result, available amounts of timber and logging residues were estimated at 375,466 m3 (89.9%) and 203,850 m3 (80.0%), respectively. Because their transport expenses were lower than for other systems the most profitable sub-compartments were operated by private logging contractors who sold logging residues at a plant. The profitable sub-compartments operated by individual forest owners were few because the extracting distances were usually greater than 20 m. Raising logging residue prices from 3,000 yen·m-3 to 4,080 yen·m-3 or 6,800 yen·m-3, and establishing forest roads, which reduced some extracting distances to less than 20 m, increased the number and area of profitable sub*compartments, and increased available amounts of logging residues.

关 键 词:GIS supply potentials private logging contractor individual 

分 类 号:S718.5[农业科学—林学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象