水流外掠单体冰柱融化速率试验研究  

Experimental Research of the melting Rate of Water Flow Across Sngle Ice Pillar

在线阅读下载全文

作  者:孟凡康[1,2] 于航[1] 

机构地区:[1]同济大学机械与能源工程学院,上海201804 [2]辽宁工程技术大学建筑工程学院,辽宁阜新123000

出  处:《流体机械》2014年第10期73-77,共5页Fluid Machinery

摘  要:建立水流外掠冰柱实验台,分别开展了水流速度(0.02、0.03、0.04、0.05、0.06和0.07m/s)、水流温度(7、10、13、16和19℃)、冰柱直径(60、70、80和105mm)及冰柱初始温度(-12、-8和-5℃)对于冰柱融化速率的影响研究。通过对融化时间的统计和分析,获得以下结论:水流温度对于融化时间的影响呈幂函数规律;水流速度和冰柱直径对于融化时间的影响呈线性规律;冰柱初始温度对于融化时间影响较小。The experiment table of water flow across ice pillar was established in this research which mainly analysis how the water velocity (0.02 m/s,0.03 m/s,0.04 m/s,0.05 m/s,0.06 m/s and 0.07m/s),diameter of the ice pillar (60mm、70mm、80mm和105mm),the temperature of water flow(7℃、10℃、13℃、16℃和19℃) and initial temperature of the ice pillar (-12℃、-8℃和-5℃) influenced on the ice pillar melting rate.By analyzing the statistic of melting times,some conclusion could be got as follows:The effects of water temperature on melting time are representing as power function.The effect of water ve-locity and diameter of the ice pillar on melting time are representing as linear.And the influence of initial temperature of ice pillar on melting time has a minimal effect.

关 键 词:冰柱 水流外掠 融化速率 试验研究 

分 类 号:TH137[机械工程—机械制造及自动化] TK02[动力工程及工程热物理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象