基于模糊综合评价的矿山总图方案优选  被引量:1

Optimization of Mining General Layout Plan Based on Fuzzy Comprehensive Evaluation Method

在线阅读下载全文

作  者:魏兵兵[1,2,3] 张传信[1,2,3] 叶振华[1,2,3] 郝学冉[1,2,3] 

机构地区:[1]中钢集团马鞍山矿山研究院有限公司 [2]金属矿山安全与健康国家重点实验室 [3]金属矿产资源高效循环利用国家工程研究中心

出  处:《现代矿业》2014年第10期19-21,26,共4页Modern Mining

摘  要:利用模糊综合评价法,并根据矿山总图设计自身的特点,建立矿山总图设计评价指标体系。借助模糊数学理论,引入分层的方法,将定性与定量相结合,从多个因素出发对复杂的矿山总图设计方案进行综合评价。最后运用模型对一矿山总图设计实例进行评价优选,得出结论,进而验证评价模型的可行性和有效性。According to the characteristics of general layout design in mines, the evaluation indexs system of general layout design is established by adopting the fuzzy comprehensive evaluation method. Combining with the qualitative and quantitative evaluation methods so as to conduct comprehensive evaluation on the general layout design based on multiple factors based on the fuzzy mathematics theory and layered approach. Finally, the general layout design of a mine is evaluated by the evaluation model. So, the feasibility and effectiveness of the evaluation model are validated.

关 键 词:总图设计 多层次 模糊评价 

分 类 号:TD21[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象