检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢士华[1]
机构地区:[1]广州番禺职业技术学院建筑工程系,广东广州511483
出 处:《建筑科学》2014年第11期107-111,共5页Building Science
基 金:校级项目:深基坑支护体系设计研究
摘 要:旗峰公园站为广东东莞市城市快速轨道交通R2线的换乘站,处于东莞市旗峰路和东莞大道交叉路口,地处繁华地带,周边有重要建筑物,管线密集,施工风险高。为确保施工安全,进一步改进施工工艺,对施工全过程进行监测;同时利用数值模拟技术模拟深基坑支护的动态过程,并与监测结果进行比较,从不同角度对深基坑的开挖支护进行稳定性评判。结果表明,理论分析和实际监测结果较吻合,为本工程的顺利实施提供了依据。The station of Qifeng Park is an interchange station of Dongguan' s rapid rail transit R2 Route, and it is located at the intersection of Qifeng Road and Dongguan Dongguan Avenue. It is a downtown area with intensive pipelines, surrounded with important buildings, and hence it has high risk of construction. To ensure construction safety, the construction technology is improved, and the monitoring of the whole construction process is carried out. The technology of numerical simulation is employed to simulate the dynamic process of deep foundation pit support, and it is compared with the monitoring results, so that the stability evaluation of the excavation support of deep foundation pit is done from different perspectives. The results show that the theoretical analysis and the actual monitoring results comparatively fit with each other, and it provides evidence for the construction of this project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28