某煤化工多联产项目废水处理工程设计  被引量:1

Process Design of Wastewater Treatment Engineering in a Poly-generation Project of Coal Chemical Industry

在线阅读下载全文

作  者:毕源[1] 刘小明[1] 张宝林[1] 杨志[1] 

机构地区:[1]北京朗新明环保科技有限公司,北京100039

出  处:《中国给水排水》2014年第22期96-99,共4页China Water & Wastewater

摘  要:某新建煤化工多联产项目配套建设了废水及回用水处理站,其中废水处理站设计规模为3×104m3/d。废水处理工艺针对水质、水量及处理要求,对含高浓度有机物的BDO(1,4-丁二醇)生产废水采用隔油/气浮/高效厌氧反应器做分质预处理,预处理出水与其他生产污(废)水混合、调节后进入生化系统。生化系统合格出水作为回用水站原水,其水质满足回用水处理站进水水质要求。Both the wastewater treatment station and the reclaimed water treatment station were de-signed in a newly-built coal chemical industry project. The capacity of the wastewater treatment stationwas 30 000 m3/d. In consideration of the wastewater quality, quantity and the treatment requirement, theBDO wastewater which contains a high concentration of organic was designed for quality-based pretreat-ment in an oil separation/air flotation/high-efficiency anaerobic reactor. The effluent from the pretreat-ment process was mixed with other sewage and wastewater in the equalization tank after which the mixedwastewater entered the biochemical system. The effluent from the biochemical system pumped into the re-claimed water treatment station met the requirements.

关 键 词:煤化工废水 BDO废水 分质预处理 AO 

分 类 号:X784[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象