检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安有色冶金设计研究院 [2]金堆城钼业股份有限公司
出 处:《黄金》2014年第11期73-75,共3页Gold
摘 要:二段磨矿是黄金炭浸厂生产中的关键环节,不仅影响生产技术指标,同时因其作业高能耗的特点,对选矿控制生产成本也起着至关重要的作用。通过对某金矿炭浸厂二段磨矿过程进行优化实践,取得了良好的效果;这说明在生产中重视磨矿过程技术参数的优化和磨矿过程的精细化操作,对提高炭浸厂的生产能力、节能降耗、降低生产成本、提高企业经济效益具有重要的现实意义。The two-stage grinding is a key link in gold CIL plant production. It not only affects technical index in production, but also plays a decisive role in cost control of mineral processing production process due to the characteristics of the high energy consumption. Optimization of the two-stage grinding process is carried out on a gold CIL plant in one gold mine, the practice of which has achieved good results. It indicates the importance of attaching great importance to the optimization of grinding process parameters in production. It has important practical significance for improving CIL plant's production capacity, energy saving, reducing production costs and improving economic efficiency of enterprises.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143