作 者:陈智慧[1]
机构地区:[1]中铁第四勘察设计院集团有限公司道路院,武汉430063
出 处:《铁道标准设计》2014年第12期104-108,共5页Railway Standard Design
摘 要:湄渝高速公路中仙至坂面段的珠峰隧道洞口地段需下穿堆积体,施工过程中存在较大风险,针对该隧道开挖断面大(163m2)、洞口埋深浅、围岩条件差、地下水较为发育的特点以及存在的问题,提出地表注浆、超前管棚支护、接长明洞、加强洞内支护,双侧壁导坑法短进尺开挖等多项综合处理措施,并利用数值模拟验证了设计方案的可行性。验算结果表明,设计方案能够满足边坡及隧道的安全性要求,对控制土体变形,减小沉降具有明显的效果,可达到预期的设计目的。The Mei-Yu highway Zhufeng tunnel, located between Zhongxian and Banmian, has to pass through a wide range of colluvial deposits, which may face some risks during construction. Because of the difficult construction conditions such as large excavation cross section ( 163 m2 ) , shallow burial, poor rock condition and rich underground water, corresponding measures as strata grouting, advance shed supporting, extended open-cut tunnel and reinforced internal support, and double-side-wall pilot hole are proposed to pass through colluvial deposits. The design schedule is verified with numerical simulation and proved to meet the requirements for the safety of the slope and the tunnel, and effective to control soil deformation and reduce settlement.
关 键 词:公路隧道 大断面隧道 堆积体 施工稳定性 地表注浆
分 类 号:U459.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.67.90